Every NOC, on every project, in one place.
Statutory approvals across every live development — what has gone in, what is approved, what expires next, and who owes what to which authority. The active tasks below hold live project data; the knowledge and references below them are what the authorities require.
Active tasks
4 toolsWhere the work happens. These read and write live project data, shared with everyone who has been given the project — so what you enter here is what the rest of the team and the reports see.
NOCs Tracker
Track statutory approvals, permits and clearances across every live development — by authority, reference and expiry, shared in real time across the team.
Open tool →Project Planner and Requirements Tracker
Pick a project's location, authorities and type, and get a generated NOC requirement list with an editable timeline — export to Excel or Primavera P6, or submit it for approval into the NOCs Tracker.
Open tool →Portfolio Insights
Approval progress, overdue and expiring NOCs, real authority turnaround and workload — across every project you can see, recalculated as records change. Print a report or export the data for Power BI.
Open tool →Project Dashboard
A project as a plan rather than a list: progress across its NOCs and the requirements behind them, what is late or close to it, the data still owed by each authority — and the project's own workbook back out with your edits written into it.
Open tool →Knowledge & references
6 referencesWhat the authorities require, and the checklists built from it. Reference material only — nothing here holds project data, so it is safe to work through before an application is raised.
Guide & guided tour
How to use the portal, split by what your job actually is — looking something up, keeping a project current, or looking after people and projects. Or let the tour walk you through the real pages.
Open guide →Authorities NOC Reference — Dubai
What each Dubai authority actually requires — documents, processing duration, fees and validity — for DM, DDA, Trakhees, RTA, DEWA and others, in one lookup.
Open tool →Authorities NOC Reference — Ajman
What each Ajman authority requires for statutory approvals — built the same way as the Dubai reference, ready for authority-by-authority entries as they're added.
Open tool →Authorities NOC Reference — Ras Al Khaimah
What each Ras Al Khaimah authority requires for statutory approvals — built the same way as the Dubai reference, ready for authority-by-authority entries as they're added.
Open tool →RTA Design NOC Checklist
What RTA asks for at design stage — the submission checklist, supporting documents and requirements, in one place to work through before an application goes in.
Open tool →Drawings & Documents Checklist
The same RTA requirements, cut down to what actually gets handed in — every drawing and every document, split by type or by department, with the design conditions set aside.
Open tool →