RTA · Submission deliverables

Drawings & Documents Checklist

Only what has to be produced and submitted — every drawing and every document the RTA design NOC asks for, by stage and project type · Source: RTA eNOC – Supporting Documents (captured 23 Sep 2026)
Final only needed only at Final Design submission Conditional if required / applicable / available Manual manual applications only Source: … not on the RTA page – from the authority's own published requirements
0%
Progress

Additional sources: Empower – Service & Road Project NOC Requirements · Empower – Other Types of NOC Requirements · DM Stormwater Design Guidelines (Jan 2025) · DM Sewerage Design Guidelines (Jan 2025)

Ticks are kept while this page is open. Use Export CSV or Print to keep a record for the submission file.